Samur Factory Project

Portfolio Description

150 kW Samur Factory Project / ERBİL

Royalstar Energy Systems has successfully realized and commissioned the Hybrid Control Panel project for the solar power plant with an installed power of 150 kW in QWAT AL-SAMUR factory in Erbil.
Grid, Solar Energy System and Generator work synchronized together.Excess energy produced from solar energy during the day is exported to the grid. In case of a possible power outage, the generator is automatically activated and solar energy production continues. By operating the generator with minimum power, solar energy is utilized at maximum level. In this way, fuel is saved from the generator (cost is reduced) and solar energy production meets consumption without interruption.The system operates fully automatically.

We thank QWAT AL-SAMUR factory for working with us